Lima Envec won the order to line 8 off half tanks. The tanks are part of a large washing plant used to separate copper from other materials. The tanks were coated with a 4mm thick lining to protect against wear and corrosion.

The tanks in the 3 stages, new, blasted, and finished.

In addition to the tanks a large scroll and flights were coated.